List of officers who claimed Excess Bills  
Sl. No Name of the Work Details of Excess Billing Excess Amount Claimed (In RS.) Name of the AE Name of the ADE/DE checkmeasured the Bill
1 Inspection of works pertaining to Execution of R&M Works of DTRs in S.Kota Section of Vizianagaram Division on 27-4-09 a) Out of 2 Nos. male contacts of tilting type 11 KV AB Switch 1 No. was not replaced.
b)2 Nos. female contacts of tilting type 11 KV AB Switch were not replaced.
c) 2 Nos. Bi-Metallic connectors not replaced on HV Side of the DTR. d) 3 Nos. Bi-Metallic connectors not replaced on HV Side of the DTR but billed.
837/- Sri.B.Venkata Rao, Ex-AE/O/S.Kota (presently AE/O/Kothavalasa) Sri.A.Anantha Rao, ADE/O/S.Kota
2 Inspection of works pertaining to Execution of R&M Works for maintenance of DTRs, Sub-Stations & HT/LT Lines in Gandepalli Section of Jaggampeta Division in Rajahmundry Circle on 4-7-09
Erection or dismantling of pipe earthing for structure and pit excavation not executed but bill claimed. 900/- Sri.M.V.Ramana, I/C AAE/O/Gandepali Sri.P.Trinadha Rao, ADE/O/Jaggampeta
3 Inspection of works pertaining to Execution of R&M Works for maintenance of DTRs, Sub-Stations & HT/LT Lines in Sankavaram Section of Tuni Sub-Division of Jaggampeta Division in Rajahmundry Circle on 7-7-09 & 8-7-09
1) 95 sq.mm XLPE cable not provided but biled

2) 1 No. G.I earth pipe 40 mm dia was not provided but billed.
424/- Sri.M.Ravi Kumar, I/C AAE/O/Sankavaram Sri.G.Rambabu, ADE/O/Tuni (presently ADE/O/ Kakinada

 
 